STCC · Permit
Work / Hot Work Permit
Required before any renovation, repair, or hot work in your unit. Complete this permit online, print it, and submit the signed copy to the management office at least one week before work begins.
Solstice Tower Condominium Corp.
Work / Hot Work Permit
Tenant / Unit / Establishment:
Building:
Work to be done:
Date(s):
Time:
Project Engineer / Supervisor:
Contact No.:
Contractor / Company:
Emergency No.:
Person-in-charge:
List of power tools / equipment
| Item | Quantity | Characteristic |
|---|
For hot work permit
Fire watch personnel:
Welder:
Portable Fire Extinguisher (QTY):
Oxygen-Acetylene Welder:
I hereby certify that all works to be done within the duration of this permit will be in accordance with the House Rules & Regulations / Construction Guidelines set by ALI / APMC. I have understood all provisions and rules in the pre-work safety orientation as conducted by the Admin personnel.
Signatures
Manager / Tenant / Owner:
Printed Name & Signature
Contractor Representative / Project Leader:
Printed Name & Signature
Approved by:
Assisted by: MOD
Received by:
Printed Name & Signature · Date Received
Inspected by:
Guard on Duty · PM / TA
Terms and Conditions
- All work permits shall be accomplished and submitted one week prior to work commencement; in case of urgent/emergency works, APMC PM/TA shall have the discretion for approval.
- Workers shall accomplish a signed Job Hazard Analysis (JHA) under their company logo covering all activities, submitted to the APMC PM/TA prior to work. Absence of a JHA means non-approval of work mobilization.
- All works shall not cause damage exceeding utility capacities of the leased area or building and shall comply with the ALI/APMC House Rules and Regulations and Construction Guidelines.
- Painting or spraying shall be done when the building is non-operational and air-conditioning is off. The PM may confiscate materials and equipment used for painting or spraying.
- Any work affecting adjacent tenants or common areas may be subjected to work stoppage.
- If workers defy a stoppage or PM orders, APMC / PM may confiscate materials or equipment to effect the stoppage.
- Tampering with work permits without PM authorization renders the permit void.
- Damages caused by construction works will not render ALI / APMC liable.
- Any person caught smoking in the building construction area shall be banned entry and fined per the Construction Guidelines.
- Use of common utilities has corresponding charges determined by the Property Manager.
Accomplish this form in two copies: (1) Tenant's / Establishment Copy and (2) Security / APMC Copy